Commitment for the country's uninterrupted supply with energy
Ensuring the country’s continuous and uninterrupted electricity supply, fulfilling all quality, safety and performance criteria, is our foremost objective which runs through all our activities in our role as Operator of the Hellenic Electricity Transmission System.
Impartiality
Guaranteeing equal and non-discriminatory access to the System for all Users.
Transparency
Employing procedures of absolute transparency and providing electricity market participants with all information pertinent to the strengthening of competition.
Performance
Performing our duties as Transmission System Operation in the most efficient manner with optimal utilization of all available resources, contributing to national development, serving the public interest and creating value for all our stakeholders.
Sustainable development
Performing our duties according to the principles of sustainable development, under economic, social and environmental terms, contributing to research and development, professional training and skills development of our human resources.
2
subsidiaries
Ariadne Interconnection Grid
Telecom
51
%
State
24
%
State Grid
25
%
ASE
5
bn €
investments up to 2030
1600
Workers
21
Ultra-high Voltage Centers
356
Substations
Establishment of the Regional Security Coordinator in Thessaloniki, (SEleNe CC).
SEleNe CC was established by the Transmission System Operators of Greece (IPTO), Italy (TERNA SpA), Romania (Transelectrica) and Bulgaria (ESO-EAD).
The mission of this new body is to ensure the efficient cooperation and coordination between the Electricity Systems and the Electricity Markets in Greece, Bulgaria and Romania, aiming to play a critical role in the new era of the integrated European electricity market.
Establishment of subsidiary Grid Telecom, the Independent Power Transmission Operator's vehicle for providing telecommunications services to national and international providers.
Establishment of special purpose vehicle Ariadne Interconnection, to undertake IPTO’s largest project, the interconnection of Crete with Attica.
Participation of the Independent Power Transmission Operator (IPTO) in the share capital of the Energy Exchange with 20%. The HEnEx aims at the coupling of the Greek market with the other European markets, the reinforcement of competition and transparency, with direct benefits the reduction in energy cost and the assurance of better prices for households and businesses and the assurance of energy supply security, the diversification of energy sources in the energy mix and the further increase of RES participation.
Listing of ADMIE (IPTO) HOLDING in the Athens Exchange.
ADMIE HOLDING holds a 51% stake in the share capital of the Independent Power Transmission Operator S.A. (IPTO), and is the first public sector company to be listed in the stock market after 11 years.
Acquisition of a 24% stake by State Grid, the industry's largest and most profitable company.
The Independent Power Transmission Operator S.A. (IPTO) was established with Law 4001/2011 and was organized and operates as an Independent Transmission Operator in line with the provisions of EU Directive 2009/72/EC.
The Company has the responsibilities and performs the duties of the Owner and Operator of the Hellenic Electricity Transmission System (HETS).
IPTO’s compliance with the requirements applicable to the model of the Independent Transmission Operator was certified by the Regulatory Authority for Energy in December 2012.
The mission of IPTO is the operation, control, maintenance and development of the Hellenic Electricity Transmission System, to ensure the country’s supply with electricity in an adequate, safe, efficient and reliable manner, as well as the operation of the electricity market.